Evaluating Adaptive Ramp Metering Control
Project
description:
California PATH MOU
3013: This project propose to evaluate a number of off-the-shelf
as well as new ramp metering algorithms using PARAMICS, identify
the most promising ramp metering algorithm and implement it in District
12 and possibly in District 4. The project will document the findings
of both laboratory and field evaluation results and develop guidelines
for ramp metering implementation and operations at other locations.
Papers
and reports:
Future research:
- Testing ramp metering algorithms under different
scenarios
- Development new ramp-metering algorithm
- Integrated control
Contact:
Studied site
|